?? Happy moment for budget man
???

After graduating from the school in 19 years, he bid farewell to the former campus life and embarked on a new life journey. He came to the Caoxian resettlement housing project of CCCC first public security bureau. Looking back on the past year, we have paid our sweat and gained knowledge. The life here is simple and simple, and what we harvest every day is happiness.
For us who have just graduated, we have to gain something from our work every day. Let's talk about it from our budget post. At the beginning of the budget, although it is professional counterpart, but in actual operation, I always feel at a loss. I am worried that the calculated data is not accurate enough and cause losses to the project. Under the guidance and encouragement of the master, I was allowed to do it freely because it was a professional counterpart, so it was not so difficult to work. In the absence of such a big burden in the heart, slowly self-confidence, the whole person has become cheerful, every day can experience the joy of harvest.
Budget staff because to ensure the accuracy of the data, so the work to be careful, so the work content is boring. With the progress of the work, one by one staggered axis to a column standing on the axis, and then to the shear walls between the columns. Each component is gradually shown in the model. Then from the beams intersecting vertically and horizontally to the plates with different thicknesses arranged between the beams. In this way, the members of the first floor are established, and then the stress bars and negative bars are arranged, which is perfect. I can't help feeling excited when I see my works.
The completion of the first floor is only a small step, although it is worth happy, but still did not reach the end. With the experience of one floor, the floors behind the reconstruction are more handy. With the passage of time, the floors rise a little bit. After unremitting efforts, the single building is finally "capped". When I see the drawings after my treatment, I can see the appearance of the completed building, and the sense of pride arises spontaneously. In addition to being happy, there are 14 other buildings and a basement waiting for us. The revolution has not yet been successful. Comrades still need to work hard.
The establishment of the model is to provide data support for the actual construction, especially in the weekly cost accounting. In order to control the cost of the project, statistical analysis is carried out on the supplied materials every week, such as concrete materials. The actual pouring amount of concrete in each part should be compared with the design quantity to see whether we control the material within a reasonable range. At the beginning, there are some errors between the design quantity and the actual pouring amount. Through constant comparison to the site and continuous improvement of the model, many new knowledge are learned in the process of improvement. At the same time, the model is more in line with the actual construction on site, providing more accurate data for the site construction. When I give you the exact data, it's self-evident.
Although the life on the construction site is not as spacious and bright as that in the office building, the environment is beautiful, but it is also clean and tidy. There are also a group of lovely people here. They are simple, simple and teach each other with all their money. They let us have a kind of happiness deeply touched by the hearts of the people, a kind of happiness full of sense of achievement. (Cao county project Zhao Youdong)

Tel: 010-61842722 Fax: 010-61842901 address: No.2, lizedong 2nd Road, Chaoyang District, Beijing email: FJ @ cfhec.com
All rights reserved: Beijing construction branch of CCCC First Highway Engineering Bureau Co., Ltd ICP No. 14043


Website construction: Stand a lot